Installation

[vc_row][vc_column width=”1/4″][/vc_column][vc_column width=”3/4″][vc_video link=”https://vimeo.com/62719716″][vc_column_text]IMS Solution LLC has provided detailed written instructions to assist with the IMS Solution installation procedure in addition to the video documenting the installation procedure. Please be sure to consult the IMS Solution Instructions prior to carrying out any procedure.

To download IMS Solution Pre- and Post Procedure Checklist, IMS Solution Installation Manual and IMS Solution LLC Product Warranty, visit our Documentation Page.

Additional Installation Notes:

1. Use original snap ring to retain bearing. If original snap ring is damaged or lost, a new replacement snap ring may need to be clearanced.

2. Fitment with aftermarket sway bars must be verified with the car on the ground with the suspension fully loaded. A minimum of a 1/4″ of clearance must be observed at all times around the oil line. Contact of larger diameter sway bars or sway bars improperly installed will cause contact with the oil line and oil line failure. Fitment can only be guaranteed with properly installed stock sway bars. See photo below:

sway-bar-clearance

Basic e-mail technical support is included. Please direct all inquires to support@lnengineering.com. For all other inquires, please call 424-2-FIXIMS.

Please direct correspondence including registrations to IMS Solution LLC, Warranty Processing, PO Box 402, Momence, IL 60954.[/vc_column_text][/vc_column][/vc_row]